Taylor Analytics Co.

Writing · The handoff

Hiring the person who takes your job.

What a real second-in-command costs, what he does, how he is paid, and the order you hand things over in.

Lots of businesses have a manager. Very few have a second-in-command.

The difference is decisions. If your manager runs the schedule but you still price every job, sign every check and handle every angry customer, you do not have a number two. You have a dispatcher with a better title. That is not a knock on him. Nobody gave him anything to decide.

The four-powers test

A real second can do four things without calling you.

Score your own man against those four right now. Most owners find they have half of one.

What it costs

In this market, a real second-in-command is $70,000 to $90,000 of base pay. Add payroll tax, insurance, a phone and a truck — your bookkeeper has the loaded percentage for your shop, and it is bigger than owners expect.

Then add the cost nobody budgets: a year of your own time teaching him. That is the real price, and it is why the hire keeps getting put off.

Now the other side of it. Take the pricing work from the article on your effective labor rate. The example shop there posts $135 an hour and collects $92. Closing part of a $43 gap across 6,700 paid hours is worth Δ $288,000 a year. You do not need all of it. A third of it pays a second-in-command, loaded, with room left over.

The cashflow you fix in month one is what pays for the man in month six.

That is the sequence, and it matters. Owners who try to hire first feel the salary and stall. Owners who fix pricing first are spending found money, and it never feels like a risk.

Promote or hire from outside

Promote if there is somebody your crews already ask when you are not there. That man has authority already; you are just making it official. Handoffs take better from inside, because the customers know the face and the crews have already agreed.

Hire from outside when nobody in the building can pass the four-powers test, or when the person who could is not willing. Hire for character and industry sense over polish. A man who has run a crew for fifteen years and cannot spell will do this job. A man with a clean resume who has never told anybody no will not.

Either way, the mistake is not picking wrong. The mistake is picking, and then handing nothing over.

What to score a candidate on

Six things. Write them down and score every candidate on the same six, including the ones already on your payroll.

  1. Judgment under pressureGive him a real situation from last month and ask what he would do. Listen for whether he asks about money and about the customer, or only about the work.
  2. ArithmeticCan he price a job in front of you, out loud, with a rate sheet? If he cannot do the math he cannot hold the price.
  3. Willing to be unpopularAsk him about a time he had to tell somebody no. If he has no story, he has never held authority.
  4. Customers believe himPut him in front of two accounts and watch. You will know inside ten minutes.
  5. Can be wrong in publicHe will make a bad call. Can he say so without falling apart or blaming a crew?
  6. Wants the job, not the titleThe job is harder than yours in some ways and pays less. Some men want it. Most want the name on the door and none of the Sunday nights.

The handoff, in order

This takes 12 to 18 months when it is done on purpose. It takes forever when it is not. Here is the order, and the order is not negotiable.

  1. Quoting goes firstIt is the scariest one to give up, which is exactly why it goes first. Everything else hangs off pricing. Shadow you, then quote with you checking every one, then quote solo with a weekly review of the numbers. A second who cannot price work is a foreman.
  2. Then the upset customerHe takes the call, he decides what to do, he spends up to a limit to fix it. You hear about it after. This is the one that makes crews believe the handoff is real.
  3. Then spendingA written dollar limit. Start where it makes you slightly uncomfortable. Raise it every quarter that nothing goes wrong.
  4. Then hiringInside a headcount and a wage band you set. He interviews, he chooses, he lives with it.
  5. Last, the relationshipsYour ten best customers. Whose cell number is on their fridge? If it is yours, those ten accounts are a single point of failure, and the point is you. Getting your second into those kitchens takes a year of deliberate introductions. Slow on purpose.

A second-in-command who has never made a bad call is one you cannot trust yet. Set real limits, then let him be wrong inside them. The bad $2,000 decision he makes this year is the cheapest training you will ever buy. The other option is you making every decision until the day you cannot.

How he is paid

Base pay plus a bonus on a number he actually controls. Gross margin on the jobs he priced. On-time rate. Rework. Something he can see weekly and move by Friday.

Not a share of the profit. He cannot see the profit, he does not believe your version of it, and it will be the source of every awkward conversation you have for three years. If you want to give him a stake in the whole business, that is a real conversation with your attorney and your accountant, and it is a different one from paying him well.

And pay him to stay, on purpose. Whether the man who could run your place is paid like it is exactly the kind of thing the Baseline is built to surface. The worst answer is not "no." The worst answer is "no, and he knows it."

What this does for a bank, and for a buyer

"There is an operator besides the owner" is a box on a credit memo. When it is empty, that is a reason to decline the loan. It is not a reason to pay less.

I am careful about that distinction, because a lot of people will quote you a percentage that a second-in-command adds to the price of your business. There is no honest published number for that, and anybody giving you one is guessing. What is real is the room you get shown to.

Two shops, same earnings on paper. One runs when the owner is gone: a real second, decisions written down, customers loyal to the company. The other needs the owner's phone ringing. The first can be bought by anybody with a bank behind him. The second can only be bought by somebody paying cash who is willing to move to your town and do your job.

That is not a lower price. That is a smaller room.

The reason to start now

Twelve to eighteen months is the honest timeline, and it does not compress. You cannot buy it late with money. The year of introductions is a year. The quarter of shadowed quoting is a quarter.

Which means the only bad time to start is the year you need it — after the diagnosis, after the offer, after the partner walks. Start it in a normal year, when there is no pressure and you can afford to let him be wrong.

Questions about the second-in-command

What does a real second-in-command cost?

Typically $95,000 to $130,000 all in for a service business in this range, once you count payroll taxes, a vehicle and some form of incentive. The number that matters is that it's usually less than the gap found in the first cycle — which is why cash comes first in the plan. The money for the hire is found before the hire is made.

What does the job actually have to include?

Four things, or the hire doesn't count: quoting work solo, handling an unhappy customer without you, spending money to a stated limit, and being paid enough to stay. A number two who has to check with you on any of those four is an expensive assistant, not a replacement, and the two-week test will show it.

Should I promote from inside or hire out?

Either works and the deciding factor is usually whether anybody inside already quotes. Promoting is cheaper and faster but only if you're willing to pay the promoted person like a number two rather than like a promoted technician. Underpaying the hire is the most common way this phase fails, and it fails about eighteen months later when they leave.

If you want to work out whether you have a second-in-command or a dispatcher, that is what the first half hour is for. It is free, and there is no pitch at the end of it.

Talk to me